Overview

The Sanitarium Berkeley Vale HV Supply project involved the manufacture and supply of high-voltage (HV) infrastructure to meet the power requirements at the Berkeley Vale site. The scope of work included the design, manufacture, and supply of 1000kVA and 2000kVA 11kV/415V kiosk substations, along with the installation of 11kV revenue high-voltage metering units. The project aims to provide reliable and efficient electrical supply for the operations at the Berkeley Vale site, ensuring safe power distribution and accurate monitoring for Sanitarium.

Objectives

  • Manufacture and supply 1000kVA and 2000kVA 11kV/415V kiosk substations to meet the site’s power needs.
  • Supply 11kV revenue high-voltage metering units for accurate power monitoring and billing.
  • Deliver the project within the agreed timeline and budget, ensuring a seamless and efficient electrical system for the customer.

Scope of works

  • Manufacture and supply of 1000kVA and 2000kVA 11kV/415V kiosk substations to provide power for the Berkeley Vale site.
  • Supply of 11kV revenue high-voltage metering units to ensure accurate monitoring of energy consumption.

Supplied Items

  • 1000kVA 11kV/415V Kiosk Substations: Designed and supplied to meet the power requirements of the Berkeley Vale site.
  • 2000kVA 11kV/415V Kiosk Substations: Larger substations for handling the higher power demand at the site.
  • 11kV Revenue High-Voltage Metering Units: Installed for accurate measurement and billing of electrical consumption.

Key Deliverables

  • 1000kVA and 2000kVA 11kV/415V Kiosk Substations: Manufactured and delivered to ensure stable and reliable power distribution to the site.
  • 11kV Revenue High-Voltage Metering Units: Installed to monitor energy usage accurately for operational and billing purposes.
  • Commissioning of all systems: Ensured that all equipment was fully operational and compliant with industry standards.

Outcome

The Sanitarium Berkeley Vale HV Supply project is set for completion in early 2025. The project will deliver essential power infrastructure, including high-capacity kiosk substations and accurate revenue metering units, ensuring a reliable and efficient electrical supply at the Berkeley Vale site. The successful implementation of the systems will support Sanitarium’s operations, providing safe and optimized power distribution for their facilities.